Operations
2
Section 2.2
System Initialisation
Power on the system in the correct sequence, verify the Dante network is active, and recall the saved TF3 scene.
2.2.1
Power-On Sequence
Always power on in this order to protect the FOH speakers and allow the Dante network to establish before the console initialises.
FOH Speakers: Always Last On, First Off
Powering on the FOH speakers before the console is fully initialised can cause loud pops that may damage the speaker drivers. Always power speakers last.
| Task | |
|---|---|
| Power on the Stage Rack (Tio1608-D and Netgear M4250). | |
| Power on the AV Ops Rack (Teltonika router first, then TF3). | |
| Power on the Shure SLX-D wireless receivers. | |
| Power on the Shure PSM300 IEM transmitters. | |
| Power on the FOH speakers last. |
2.2.2
Dante Network Verification
If Dante Devices Are Not Visible
Check that the D-PRI network cable is connected at both ends. Check that the Netgear M4250 is powered on. Allow an additional 30 seconds and refresh the Dante device list.
| Task | |
|---|---|
| On the TF3, navigate to Setup > Dante and confirm the Tio1608-D is visible as a Dante device. | |
| Confirm all 16 input channels are patched from the Tio1608-D. | |
| Confirm all output channels are patched to the Tio1608-D. |
2.2.3
TF3 Scene Recall
| Task | |
|---|---|
| On the TF3, navigate to Scene > Recall. | |
| Select the most recent saved scene (e.g., 'Sanctuary Church v1.0'). | |
| Confirm the recall. All channel settings, EQ, and routing will be restored. | |
| Connect to TSC-MIX-FOH on your iPad and open TF StageMix to confirm remote control is working. |