Operations
8
Section 2.8
System Shutdown
Safe power-down of the entire system, cable management, and equipment storage.
2.8.1
Power-Down Sequence
Always power down in the reverse order of power-on. FOH speakers must be powered off first.
Save the TF3 Scene
Before powering off the TF3, save the current scene if you have made any changes during the service. Navigate to Scene > Save and overwrite the existing scene, or save as a new version.
| Task | |
|---|---|
| Confirm FOH speakers are already powered off (completed in Phase 7). | |
| Power off the PSM300 IEM transmitters. | |
| Power off the Shure SLX-D wireless receivers. | |
| Power off the TF3 console (hold the power button, confirm shutdown). | |
| Power off the Teltonika router. | |
| Power off the Stage Rack (Tio1608-D and Netgear M4250). |
2.8.2
Cable Management & Storage
| Task | |
|---|---|
| Coil all cables using the over-under technique and secure with cable ties or velcro straps. | |
| Disconnect and store the network cable between the racks. | |
| Store all equipment in designated cases or rack positions. | |
| Ensure the stage area is clean and all equipment is accounted for. |